Search

5/10/2020 Monday Update

A new week and a new update. This week I'm going to be discussing some changes in productions and some information about upcoming GB's Production I took a look at the keycap sets I've run a cable for and I've made a decision that is going to benefit me and you guys. Some of you might not like this next part and some of you might like it. Down below you'll find the GB's we've run a cable for and the estimated shipping dates for each set. Keep in mind, this does not represent my shipping dates. I do want to point out that the whole idea is that I want you to receive the cable before the keycap set(ASAP) Masterpiece: Q1 2021 Arctic: December 2020 (I did get notified that this might change to a later date)

Midnight Rainbow: Feb 2021 Ivory: November/December (this might change as everything is delayed at this point) Explosion: Q2 2021

Strawberry Lemonade: ??

Isthar: Q2 2021 Some other GB's that I ran that are far in the future

So as you can see most of the dates are far out. Like I've mentioned before this does NOT represent my shipping dates. Now for the change. Starting now I'm going to focus a lot more on quality. Before this week I was sooo stressed out on getting cables out the door as soon as possible. Now that I have a clear vision on when the keycap sets ship I want to actually focus more on the quality of the cable instead of focusing on the quantity. This means that there are going to be fewer cables going out per week. BUT I'm still keeping in mind that you guys have been waiting a long time on your cables, some more, some less. Before the last 2 weeks, I've been coiling and packaging the cables within 2-3 days, which is very fast. I'm going to increase my time frame to 1 week for this process as it's the most crucial part of the cable making. I've also changed 1-2 thinks in shipping, instead of receiving the cable loose in the box, you'll receive your cable still on the stick that it got coiled on, this ensures the total quality of the cable and you receive a "fresh" cable. I'm not saying that the cables I've shipped before these are bad, but more than the new is safer. (I do have to get bigger boxes as the stick barely fits in the box, for the peeps that get this batch, please let me know in discord or via email if your cable is good) I'm going to be aiming for 30-35 cables per 2 weeks. Group buys.


I'm currently still waiting on the cerakoted connector from my guy. Once they are in I'm going to be announcing the Demon Sword and the Red Dragon cables. I'm hoping for this week! That was it for this week, it was a long post and I'm hoping not too many of you are mad at me now! Keep in mind I do this for you guys!!!!

169 views

Recent Posts

See All

12/10/2020 Monday update

This week's update is going to be short as I don't have much to add from last week. I'll start it off by saying that this week and next week I'll be getting another batch ready to ship. Around 30-35 c

28/9/2020 Monday Update

Hi guys. In this week's news, I'm going to be discussing 2 subjects. Production and Group buys I'll start off by giving some information about the production and some info on the timeline on the orde